Office & Data Center Decommissioning

Closing an office, consolidating locations, or exiting a data center? We de-install, inventory, sanitize, and remove everything — and leave the space clean.

// One crew, one plan

Every Rack, Cable, and Drive Accounted For

Decommissioning projects usually involve a mover, a recycler, a data destruction vendor, and an IT team that's busy with everything else. Things get missed — and sometimes those things have data on them.

SYNTRA handles the whole job with one crew and one plan: we power down and de-install systems in the right order, tag every asset, destroy data, and route each item to redeployment, resale, or recycling.

  • Detailed asset inventory before anything moves
  • Coordinated with your landlord, colo provider, and movers
  • Data destroyed on site or under chain of custody
  • Value recovery to offset project cost

~/decom/rack-row-b.jpg

Server rack in a dark data center

// scope.txt

What's Covered

Planning & Inventory

Site survey, asset audit, and a sequenced shutdown plan.

De-Installation

Servers, storage, network gear, racks, and cabling removed safely.

Data Destruction

On-site wiping or shredding with serialized certificates.

Logistics

Packing, secure transport, and relocation of equipment you keep.

Value Recovery

Resale of qualifying equipment to offset project costs.

Recycling & Cleanup

Everything else recycled; space left clean and ready to hand back.

// decom.sh

Decommissioning Timeline

  1. 01 survey

    Survey

    Walk the site and inventory every asset.

  2. 02 plan

    Plan

    Shutdown order, migrations, and access windows.

  3. 03 de-install

    De-Install

    Power down, unrack, and tag each item.

  4. 04 sanitize

    Sanitize

    Wipe or destroy all data-bearing media.

  5. 05 close

    Close Out

    Final report, certificates, and clean site.

// faq --decom

Frequently Asked Questions

Can you migrate systems before shutting things down?

Yes. Our cloud & infrastructure team can move workloads to a new location or the cloud first, so decommissioning happens only after everything is confirmed running.

Do you work in colocation facilities?

Yes. We coordinate access, escort requirements, and loading-dock schedules with your colo provider.

How far ahead should we plan?

The earlier the better, especially if a lease end date is fixed. Reach out as soon as you know your timeline and we'll build the schedule backward from it.