Workstation Rollouts
Procurement, imaging, data migration, and white-glove desk-side setup.
From a 10-laptop refresh to a multi-site rollout, we plan, stage, and deliver technology projects on schedule — with minimal disruption to the people doing the real work.
// Done right the first time
Missed deadlines, half-configured laptops, a network that "mostly works" after the move — projects are where under-resourced IT breaks down.
SYNTRA runs every project with a named lead, a written scope, and a checklist-driven process. Devices are imaged and tested before they reach your office, and we stay on site until your team is back to work.

// ls ./projects
Procurement, imaging, data migration, and white-glove desk-side setup.
Network, cabling, phones, and conference rooms ready before move-in day.
Rack, configure, and migrate to new servers, storage, and backup appliances.
Firewall, switching, and Wi-Fi refreshes with planned, low-impact cutovers.
Standardized deployments across branches, stores, or clinics.
Out with the old: secure wiping and recycling of replaced equipment.
// project-lifecycle.sh
Site walk, requirements, and a fixed written quote.
Order hardware and licensing at business pricing.
Image, configure, label, and test before delivery.
Install on site, often after hours, with a rollback plan.
Floor support, documentation, and old gear removed.
// git log --oneline
You'll get a project tracker with milestones, a punch list, and as-built documentation at handoff: what was installed, where, with which serial numbers and settings.
$ git log --oneline
a41f2c site survey complete
b7e019 42 laptops imaged + tested
c33d8a cabling certified (96 drops)
d90b14 firewall + wifi cutover
e5172f users onboarded, 0 tickets
f0aa31 old gear wiped + recycled
$ _
$ ./scope-project.sh
Tell us what you're planning and we'll send a fixed-scope quote.